Are there any options related to the new parallel processing or is that just default on if a new job is created in v7 ?
BR Tobias
The max parallel tasks per job is implicitly controlled by max parallel tasks setting on the backup repository used by the given job (and real backup repository throughput).lohelle wrote:I would like to suggest the possibility to limit max parallel tasks per job.
You can do this today by using only proxies with the needed proxy-slot count for the jobs with this heavy load.lohelle wrote:The backup repository might usually be slower, but live VMs usually do not run from this storage (even if YOU made it possible!).
Maybe a "number of parallel tasks" selection in the job setup where you select source proxy would be possible in a coming release..?
Scary parallel processing. 2 DAG member because of high Dedup (and both because of Surebackup) in same job.eortega wrote:Per JOB would be nice. Currently I had a situation where it processed both of my Exchange Mailbox Servers at the same time causing them to kind of freak out on who should Mount the databases.
What would be the best way to stop this from happening besides creating 2 different jobs.
Also, if you want to process VMs within certain job sequentially, it might be worth creating a dedicated repository (it might even a new folder on already existing repository) for this job and set 1 as the number of backup tasks this repository can handle. This way, any job that uses this repository will have its concurrency limited.eortega wrote:Per JOB would be nice.