We have a Scale-out Repository with object storage in Azure. The repository only keeps 1 day of backup locally before offloading 59 days in Object Storage.
Using a scheduled SureBackup job, I can't choose to pull the data blocks from the performance tier or the capacity tier so I'm guessing it defaults to the most recent copy in the performance tier?
After opening a Veeam case, seems i can manually configure SureBackup to target the Capacity Tier this using the SureBackup --> Start To and selecting a backup date that would not exist on the performance tier. But being able to regularly verify backups both on premise and in object storage would be ideal.
See corresponding Case # 03597878
-
- Influencer
- Posts: 10
- Liked: 1 time
- Joined: Mar 04, 2019 4:38 pm
- Full Name: Al De
- Contact:
-
- Veeam Software
- Posts: 2097
- Liked: 310 times
- Joined: Nov 17, 2015 2:38 am
- Full Name: Joe Marton
- Location: Chicago, IL
- Contact:
Re: [Feature Request] Schedule SureBackup Job to pull and verify from Object Storage
Unless you use "Start To," SureBackup always uses the most recent restore point. The idea is to verify its integrity and at that point any other processes to copy/move backups have safety checks to make sure everything is written properly. The main purpose of "Start To" is to provision an on-demand test/dev environment using production from a specific point in time.