I'm using backup to tape for the first time..
the size of the disk backup (4 restore points) as shown in the repository folder is about 7.7 TB.
The processing rate is about 137 MB/s
The job's been running for 19h now. What I don't understand is:
- with that processing rate, why is there only 60% completed ?
- the data processed is right now 9 TB, which is bigger than the size of the backup on disk
I must be missing something

Thanks.
Eric