-
- Novice
- Posts: 9
- Liked: never
- Joined: Aug 24, 2013 2:09 pm
- Full Name: James Bliss
- Contact:
Multiple Replication Jobs
Is it possible to have multiple replication jobs running simultaneously? I have eight remote offices with a file server each that I replicate copy back to the main office for DR. My job will only run sequentially.
Thanks,
Jim
Thanks,
Jim
-
- Veteran
- Posts: 7328
- Liked: 781 times
- Joined: May 21, 2014 11:03 am
- Full Name: Nikita Shestakov
- Location: Prague
- Contact:
Re: Multiple Replication Jobs
Hello Jim, you can`t replicate same source VM twice at the same time. And there is no much sense to take 2 snapshots. Instead you can leverage replication from backup data and run several backup copy jobs simultaneously with no problems to copy data to different remote sites.
Thanks!
Thanks!
-
- Novice
- Posts: 9
- Liked: never
- Joined: Aug 24, 2013 2:09 pm
- Full Name: James Bliss
- Contact:
Re: Multiple Replication Jobs
it's 8 different source VM's to a 1 central location.
-
- Product Manager
- Posts: 6551
- Liked: 765 times
- Joined: May 19, 2015 1:46 pm
- Contact:
Re: Multiple Replication Jobs
Hi,
How often do you want to sync you replicas and what transport mode do you use? Also why do you want to use exactly replica instead of what Nikita has suggested - replication from backup?
Thank you.
How often do you want to sync you replicas and what transport mode do you use? Also why do you want to use exactly replica instead of what Nikita has suggested - replication from backup?
Thank you.
-
- Veteran
- Posts: 7328
- Liked: 781 times
- Joined: May 21, 2014 11:03 am
- Full Name: Nikita Shestakov
- Location: Prague
- Contact:
Re: Multiple Replication Jobs
Jim, it is possible to replicate different VMs to the same target, but it`s not possible to replicate same VM with 2 jobs simultaneously.
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Multiple Replication Jobs
Check the max concurrent tasks limit on the target proxy. If it is set to 1, then all the jobs are expected to run sequentially.
Who is online
Users browsing this forum: No registered users and 20 guests