Hi
I have configured a replication job containing 2 servers and have realised that I should have created 2 x replication jobs each containing 1 server.
Am I able to split the job into 2 (remove 1 server from the existing job, add the server to a new job) without loosing the replicated data for the server?
Regards
Chris
-
- Novice
- Posts: 4
- Liked: never
- Joined: May 21, 2010 4:51 am
- Full Name: Chris Couper
- Contact:
-
- Chief Product Officer
- Posts: 31835
- Liked: 7325 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Splitting a replication job
Hi Chris, no this is not possible unfortunately. You will need to start from scratch with either server. Thanks!
-
- Novice
- Posts: 4
- Liked: never
- Joined: May 21, 2010 4:51 am
- Full Name: Chris Couper
- Contact:
Re: Splitting a replication job
Hi Anton
Thanks for the quick reply. I suspected that would be the answer but didn't want to assume in case I was wrong.
Regards
Chris
Thanks for the quick reply. I suspected that would be the answer but didn't want to assume in case I was wrong.
Regards
Chris