-
gpar
- Novice
- Posts: 4
- Liked: 2 times
- Joined: Apr 04, 2024 6:33 am
- Contact:
Incremental Backup, storage full
I'm running an incremental Backup on to a physical HDD. I did run out of storage. How can i continue / restart the backup on a new HDD?
-
Polina
- Veeam Software
- Posts: 3883
- Liked: 975 times
- Joined: Oct 21, 2011 11:22 am
- Full Name: Polina Vasileva
- Contact:
Re: Incremental Backup, storage full
1) You can start a new full backup from scratch
2) You can PowerShell to move existing data from the old repository to the new one, and then re-assign the job. Note that moving the data will take time (the process is not fast) and after you start the job on the new repository it will perform a full sync (i.e. will check all the existing adta item by item to ensure the consistency and identify deltas).
2) You can PowerShell to move existing data from the old repository to the new one, and then re-assign the job. Note that moving the data will take time (the process is not fast) and after you start the job on the new repository it will perform a full sync (i.e. will check all the existing adta item by item to ensure the consistency and identify deltas).
Who is online
Users browsing this forum: No registered users and 98 guests