Regarding the memory usage utilisation in this report:
If the report says, after failure memory usage is 80%...
Is that 80% of total memory is assigned to VMs, or consumed by them?
I.e. I can over commit memory, so a VM with 4GB of RAM is only using 1GB, is the calculation on assigned or commited?
-
- Expert
- Posts: 109
- Liked: 5 times
- Joined: Apr 21, 2020 11:45 am
- Full Name: Conrad Goodman
- Contact:
-
- VP, Product Management
- Posts: 27375
- Liked: 2799 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: VMware host failure modelling report
Hi,
The report is using memory consumed counter (not allocation) in its analyses.
Thanks!
The report is using memory consumed counter (not allocation) in its analyses.
Thanks!
-