Gday All,
Give we run our EOM on the last Friday of the month it would be good if there was an option to override/stop the end of week job from running and "colliding" with the EOM automatically and without having to either script or disable the end of week job.
-
- Novice
- Posts: 6
- Liked: never
- Joined: Oct 30, 2015 3:28 am
- Full Name: Brad Cann
- Contact:
-
- Product Manager
- Posts: 20413
- Liked: 2301 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: ability for EOM to override/stop Weekly
You appear to be after GFS type of retention. If so, why not to use one GFS tape job (introduced in version 9) instead of multiple ones orchestrated with scripts?
The GFS backup to tape job is intelligent enough to avoid the given collision.
Thanks.
The GFS backup to tape job is intelligent enough to avoid the given collision.
Thanks.
-
- Enthusiast
- Posts: 33
- Liked: 2 times
- Joined: May 28, 2015 3:23 am
- Contact:
Re: ability for EOM to override/stop Weekly
GFS does not allow multiple tape drives...
Who is online
Users browsing this forum: No registered users and 12 guests