We have active full running every Sat. And a secondary backup to tape also scheduled on last Sat of every month. So there is one day a month that we have both the active full supposed to be the first copy I think, and then the secondary tape backup.
Question: will the secondary job always wait for the periodic active full to finish before running? If they are scheduled on the same day. I think the periodic full is considered the 1st copy job that would run first right?
thanks
-
- Lurker
- Posts: 1
- Liked: never
- Joined: Apr 23, 2020 12:44 pm
- Full Name: Henry Li
- Contact:
-
- Product Manager
- Posts: 2580
- Liked: 708 times
- Joined: Jun 14, 2013 9:30 am
- Full Name: Egor Yakovlev
- Location: Prague, Czech Republic
- Contact:
Re: Active Full and Tape Copy Job
Hi Henry and welcome to The Forums!
1. No, Tape Job will not wait for main Backup Job to finish. It will start according to it's scheduled time. Split jobs in time or chain them.
2. With Veeam's Virtual Full Tape backup, you don't even need to have a Full Backup that day on a disk. Veeam can synthesize Virtual Tape Full Backup on the flight from existing increments on disk!
/Cheers!
1. No, Tape Job will not wait for main Backup Job to finish. It will start according to it's scheduled time. Split jobs in time or chain them.
2. With Veeam's Virtual Full Tape backup, you don't even need to have a Full Backup that day on a disk. Veeam can synthesize Virtual Tape Full Backup on the flight from existing increments on disk!
/Cheers!
Who is online
Users browsing this forum: Semrush [Bot] and 21 guests