B&R 9 : Parallel Processing enabled but dont work
Hello ,
I have an big ( 5TB ) Backup to Tape Job one Time in the Week on Thursday .
For this Pool i create an own Mediapool .
In this Media Pool ich check the Box : Enable parallel Processing for this Job and choose 2 Tape Drives .
But when i look at the Tape Drives , only one has an Media inserted .
What goes wrong on this Option ?
Michael
I have an big ( 5TB ) Backup to Tape Job one Time in the Week on Thursday .
For this Pool i create an own Mediapool .
In this Media Pool ich check the Box : Enable parallel Processing for this Job and choose 2 Tape Drives .
But when i look at the Tape Drives , only one has an Media inserted .
What goes wrong on this Option ?
Michael
-
- Product Manager
- Posts: 6551
- Liked: 765 times
- Joined: May 19, 2015 1:46 pm
- Contact:
Re: B&R 9 : Parallel Processing enabled but dont work
Hi,
Parallel processing is possible either between simultaneous tape jobs or between VM chains in one backup to tape jobs. As I can see form your explanation you have only one job.
So, does a backup to tape job have multiple source backup file chains to process? Say, there are several backup job selected as a source for it, or one source backup job uses that uses per-VM backup file chain option?
Thank you.
Parallel processing is possible either between simultaneous tape jobs or between VM chains in one backup to tape jobs. As I can see form your explanation you have only one job.
So, does a backup to tape job have multiple source backup file chains to process? Say, there are several backup job selected as a source for it, or one source backup job uses that uses per-VM backup file chain option?
Thank you.
-
- Veteran
- Posts: 284
- Liked: 11 times
- Joined: Jan 06, 2011 8:33 am
- Contact:
Re: B&R 9 : Parallel Processing enabled but dont work
Ok ,
A quick presentation what i have :
4 VM Backup Jobs , every 2 from this in one Backup To Tape Job , 2 Backup To Tape Jobs ( every 2 VM Backup Jobs within )
In my MSL4048 i have Build in two LTO5 Ultrium FC Backup Drives and one LTO5 Ultrium SAS Drive .
One Backup Job is very Big 6 TB , i want that this Job uses 2 Drives ( the SAS LTO and the second FC LTO )
The second Job is smaller , 3 TB , I want that he uses one LTO5 FC Drive .
A quick presentation what i have :
4 VM Backup Jobs , every 2 from this in one Backup To Tape Job , 2 Backup To Tape Jobs ( every 2 VM Backup Jobs within )
In my MSL4048 i have Build in two LTO5 Ultrium FC Backup Drives and one LTO5 Ultrium SAS Drive .
One Backup Job is very Big 6 TB , i want that this Job uses 2 Drives ( the SAS LTO and the second FC LTO )
The second Job is smaller , 3 TB , I want that he uses one LTO5 FC Drive .
-
- Product Manager
- Posts: 14726
- Liked: 1706 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: B&R 9 : Parallel Processing enabled but dont work
Answered in another thread. Let’s keep the conversation regarding the same issue in one thread please. Thanks in advance.
-
- Veteran
- Posts: 284
- Liked: 11 times
- Joined: Jan 06, 2011 8:33 am
- Contact:
Re: B&R 9 : Parallel Processing enabled but dont work
Sorry im a little bit confused ? In which other Threat it is answered ?
-
- Chief Product Officer
- Posts: 31814
- Liked: 7302 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: B&R 9 : Parallel Processing enabled but dont work
The other thread you have created on the same topic > Slow Backup to Tape Speed with three Tape Drives ?!?!
In future, to find all your posts on the forum, simply click your forum nickname, then click "Search user's posts".
Thanks!
In future, to find all your posts on the forum, simply click your forum nickname, then click "Search user's posts".
Thanks!
Who is online
Users browsing this forum: Google [Bot] and 6 guests