I don't know if I'm doing something incredibly stupid (it is a Monday morning) or if there's a bug here? Help set me straight . I'll log a ticket if this is a genuine issue.
For my setup in this scenario I always want to run full backups... never incremental.
I have a schedule set to perform a full backup to "pool 1" tapes
Instead of running a full to pool 1... Veeam B&R keeps trying to start an incremental job to pool 2 tapes. No schedule is set for incremental.
I'm willing to consider this may not be an issue and it's misconfigured... but I'm struggling to see what the problem is. Anyone have any ideas?
Here's the job running:
n.b. you can stop the job and run it again from scratch and it will quickly return to this WaitingTape status
SEE (Incremental) in brackets next to the job name.
You can see it wants me to add a tape. That's because those tapes aren't in the library. The requested tape is in pool 2 and that's not currently loaded because I don't want to write to pool 2 tapes.
This is the main screen for tape jobs. I've blanked out the details of my setup as I don't want the details visible on the internet... but behind the blocked out target section is a target which is displayed like this: "Pool 1 [Pool 2]"
You can see here, my Full Backup screen has pool 1 selected and there is a tick in the checkbox to run the job automatically.
Incremental Backup screen shows Pool 2 is selected and the checkbox for running the job is un-checked.
So either I've missed something important or there is something unusual going on here... what's the consensus?
For my setup in this scenario I always want to run full backups... never incremental.
I have a schedule set to perform a full backup to "pool 1" tapes
Instead of running a full to pool 1... Veeam B&R keeps trying to start an incremental job to pool 2 tapes. No schedule is set for incremental.
I'm willing to consider this may not be an issue and it's misconfigured... but I'm struggling to see what the problem is. Anyone have any ideas?
Here's the job running:
n.b. you can stop the job and run it again from scratch and it will quickly return to this WaitingTape status
SEE (Incremental) in brackets next to the job name.
You can see it wants me to add a tape. That's because those tapes aren't in the library. The requested tape is in pool 2 and that's not currently loaded because I don't want to write to pool 2 tapes.
This is the main screen for tape jobs. I've blanked out the details of my setup as I don't want the details visible on the internet... but behind the blocked out target section is a target which is displayed like this: "Pool 1 [Pool 2]"
You can see here, my Full Backup screen has pool 1 selected and there is a tick in the checkbox to run the job automatically.
Incremental Backup screen shows Pool 2 is selected and the checkbox for running the job is un-checked.
So either I've missed something important or there is something unusual going on here... what's the consensus?
-
- Product Manager
- Posts: 14844
- Liked: 3086 times
- Joined: Sep 01, 2014 11:46 am
- Full Name: Hannes Kasparick
- Location: Austria
- Contact:
Re: B&R attempts incremental instead of full tape job
Hello,
what kind of setup is that? No backup jobs and only imported backups? Only file-to-tape jobs instead of backup-to-tape jobs?
As you did not configure incremental runs, I cannot see why the software tries to do an incremental run. Support should be able to find out. Please post the case number for reference.
Best regards,
Hannes
what kind of setup is that? No backup jobs and only imported backups? Only file-to-tape jobs instead of backup-to-tape jobs?
As you did not configure incremental runs, I cannot see why the software tries to do an incremental run. Support should be able to find out. Please post the case number for reference.
Best regards,
Hannes
-
- Veteran
- Posts: 636
- Liked: 100 times
- Joined: Mar 23, 2018 4:43 pm
- Full Name: EJ
- Location: London
- Contact:
Re: B&R attempts incremental instead of full tape job
It's purely a tape backup of Veeam repositories. I'll log a support call.
-
- Product Manager
- Posts: 14726
- Liked: 1707 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: B&R attempts incremental instead of full tape job
Hello EJ,
Thank you for the detailed explanation! Can you please post the case ID, I'll ask QA folks to double check the logs.
Thank you for the detailed explanation! Can you please post the case ID, I'll ask QA folks to double check the logs.
-
- Veteran
- Posts: 636
- Liked: 100 times
- Joined: Mar 23, 2018 4:43 pm
- Full Name: EJ
- Location: London
- Contact:
Re: B&R attempts incremental instead of full tape job
Case number is: 04219578
Support advised clone the job. So I did that and the job worked as expected. This means the settings were correct as nothing had to be changed for the job to run.
From here the next thing will be to check if the 2nd run of the job switches to incremental. When the current job finishes I can also check if the other jobs have the same problem.
I did cycle through the settings screens several times, clicking 'finish' at the end to set the configuration. So either this is a symptom of a problem which comes during the upgrade to v10 or it is a new 'feature' in v10 which may or may not persist when we try to run the job a second time.
Will have to wait for the answer as the job takes a day or two to complete.
Support advised clone the job. So I did that and the job worked as expected. This means the settings were correct as nothing had to be changed for the job to run.
From here the next thing will be to check if the 2nd run of the job switches to incremental. When the current job finishes I can also check if the other jobs have the same problem.
I did cycle through the settings screens several times, clicking 'finish' at the end to set the configuration. So either this is a symptom of a problem which comes during the upgrade to v10 or it is a new 'feature' in v10 which may or may not persist when we try to run the job a second time.
Will have to wait for the answer as the job takes a day or two to complete.
-
- Product Manager
- Posts: 14726
- Liked: 1707 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: B&R attempts incremental instead of full tape job
EJ,
Thanks for the details. Shared with RnD folks!
Thanks for the details. Shared with RnD folks!
-
- Veteran
- Posts: 636
- Liked: 100 times
- Joined: Mar 23, 2018 4:43 pm
- Full Name: EJ
- Location: London
- Contact:
Re: B&R attempts incremental instead of full tape job
The cloned job now only wants to run an incremental. It ran full immediately after it was cloned, but on the second pass it wants to run as incremental, same as the old job it was cloned from.
Another job automatically started on a schedule and exhibits exact same behaviour. i.e. it ran a full... then on second pass it wants to change to an incremental backup.
Another job automatically started on a schedule and exhibits exact same behaviour. i.e. it ran a full... then on second pass it wants to change to an incremental backup.
-
- Product Manager
- Posts: 14726
- Liked: 1707 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: B&R attempts incremental instead of full tape job
EJ,
To clarify: incremental run is performed only when you are triggering the job manually? Cheers!
To clarify: incremental run is performed only when you are triggering the job manually? Cheers!
-
- Veteran
- Posts: 636
- Liked: 100 times
- Joined: Mar 23, 2018 4:43 pm
- Full Name: EJ
- Location: London
- Contact:
Re: B&R attempts incremental instead of full tape job
Either. When I first noticed the issue it was when automatically scheduled jobs stopped working.
-
- Product Manager
- Posts: 14726
- Liked: 1707 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: B&R attempts incremental instead of full tape job
EJ,
Discussed your case with QA folks. For manual start backup is triggered as incremental (unless you click active full backup option), this one is considered to be expected behavior. For scheduled start incremental backup should not be performed if the option is disabled in the wizard. For the second issue please keep working with the support team and let us know how the investigation goes. Cheers!
Discussed your case with QA folks. For manual start backup is triggered as incremental (unless you click active full backup option), this one is considered to be expected behavior. For scheduled start incremental backup should not be performed if the option is disabled in the wizard. For the second issue please keep working with the support team and let us know how the investigation goes. Cheers!