I am a newbie in here. I have a question with backup data from file to tape.
I want to backup data each date to each tape. Ex: monday to tap1, tuesday to tape 2....and next monday, data backup to tape 1 without overwrite until tape out of capacity.
I tried to created Daily job, Daily pool, added tape 1- tape 7 for daily backup, Media set create daily. This job run good ultil next monday, the lastest tape in tape 7 and Daily job used it for monday, data was overwrite.
So I crearted Monday job-Monday pool, Tuesday job- Tuesday poll...and add one tape to each pool for sure data of monday only write in one tape.
I know about Media set with three option but it seem no way for my idea.
Anyone have any idea with this problem.
Thank for read.
I am a newbie in here. I have a question with backup data from file to tape.
I want to backup data each date to each tape. Ex: monday to tap1, tuesday to tape 2....and next monday, data backup to tape 1 without overwrite until tape out of capacity.
I tried to created Daily job, Daily pool, added tape 1- tape 7 for daily backup, Media set create daily. This job run good ultil next monday, the lastest tape in tape 7 and Daily job used it for monday, data was overwrite.
So I crearted Monday job-Monday pool, Tuesday job- Tuesday poll...and add one tape to each pool for sure data of monday only write in one tape.
I know about Media set with three option but it seem no way for my idea.
Anyone have any idea with this problem.
Thank for read.
-
- Veeam Software
- Posts: 2597
- Liked: 606 times
- Joined: Jun 28, 2016 12:12 pm
- Contact:
Re: How to backup each day to each tape with standad pool
Hi ngan.nt, welcome to the forums.
Can I ask you to check the last answer in the FAQ here? Basically, a specific tape for each day is possible, it's just a little bit of configuration.
Can I ask you to check the last answer in the FAQ here? Basically, a specific tape for each day is possible, it's just a little bit of configuration.
David Domask | Product Management: Principal Analyst
-
- Novice
- Posts: 3
- Liked: 1 time
- Joined: Sep 25, 2024 2:53 am
- Full Name: Ngan, Nguyen Thanh
- Contact:
Re: How to backup each day to each tape with standad pool
Hi David.Domask.
Thank for your reply. I already read your link, and I used it in my system now: "So I crearted Monday job-Monday pool, Tuesday job- Tuesday pool...and add one tape to each pool for sure data of monday only write in one tape".
That solution help me with small system, but if I my system scale up, need more pool like Daily pool so I need create alot job and pool for it.

I readed about GFS. Can it solve my problem sir?
Thank for your reply. I already read your link, and I used it in my system now: "So I crearted Monday job-Monday pool, Tuesday job- Tuesday pool...and add one tape to each pool for sure data of monday only write in one tape".
That solution help me with small system, but if I my system scale up, need more pool like Daily pool so I need create alot job and pool for it.

I readed about GFS. Can it solve my problem sir?
-
- Veeam Software
- Posts: 2597
- Liked: 606 times
- Joined: Jun 28, 2016 12:12 pm
- Contact:
Re: How to backup each day to each tape with standad pool
Hi ngan.nt,
You're very welcome, and indeed, that should work.
Regarding your comment on scaling, I'm not sure I fully agree that the model particularly becomes that much more difficult, but I do get your point. The requirement for a specific tape per day is the challenge here, and GFS will not help in any meaningful way.
Veeam uses the concept of media sets for Tape backups; while the idea might seem a bit difficult at first, in short all you really need to remember is:
- When a media set closes, it cannot be reopened
- A new media set must start with a free tape
- There are several situations where Veeam may close a media set before the scheduled closing
That's why this strategy for a specific tape per day requires a bit of finessing. At scale this is doable, you simply add more tapes to a given media pool and will need to decide on your media set rotations, but once you get to the point that your backups scale past a few tapes, it's probably better to just leave it to the auto-selection as likely you will need to be searching for which tape it is anyways. In the Restore Wizard, it will tell you which tapes are needed for a given restore point, so once you start scaling larger than a few tapes for a given backup, using auto-selection makes a bit more sense I think.
You're very welcome, and indeed, that should work.
Regarding your comment on scaling, I'm not sure I fully agree that the model particularly becomes that much more difficult, but I do get your point. The requirement for a specific tape per day is the challenge here, and GFS will not help in any meaningful way.
Veeam uses the concept of media sets for Tape backups; while the idea might seem a bit difficult at first, in short all you really need to remember is:
- When a media set closes, it cannot be reopened
- A new media set must start with a free tape
- There are several situations where Veeam may close a media set before the scheduled closing
That's why this strategy for a specific tape per day requires a bit of finessing. At scale this is doable, you simply add more tapes to a given media pool and will need to decide on your media set rotations, but once you get to the point that your backups scale past a few tapes, it's probably better to just leave it to the auto-selection as likely you will need to be searching for which tape it is anyways. In the Restore Wizard, it will tell you which tapes are needed for a given restore point, so once you start scaling larger than a few tapes for a given backup, using auto-selection makes a bit more sense I think.
David Domask | Product Management: Principal Analyst
-
- Novice
- Posts: 3
- Liked: 1 time
- Joined: Sep 25, 2024 2:53 am
- Full Name: Ngan, Nguyen Thanh
- Contact:
Re: How to backup each day to each tape with standad pool
Dear David.Domask.
Your reply help me alot. Now I have more knowlege about tape backup on veeam and how media set work.
Thank you for your time and good luck.
Your reply help me alot. Now I have more knowlege about tape backup on veeam and how media set work.
Thank you for your time and good luck.