Discussions related to exporting backups to tape and backing up directly to tape.
zul
Novice
Posts: 4 Liked: never
Joined: Jul 06, 2017 1:56 am
Full Name: zul
Contact:
Post
by zul » Jul 24, 2017 3:21 am
this post
Hi guys,
Last Thursday I scheduled a Full Backup on Tape 1. And today, I scheduled another Full Backup to Tape using different tape;Tape 2.
But there are some problem with today backup:
FYI, in Tape 2 has .vib data which I will not using it anymore. Does it mean I need to erase the content in Tape 2 in order to run full backup?
Shestakov
Veteran
Posts: 7328 Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:
Post
by Shestakov » Jul 24, 2017 9:39 am
this post
Hi, tapes cannot be used if they are protected. Once
protection period is over, tapes will be rewritten, so you don`t need to erase tapes before using.
zul
Novice
Posts: 4 Liked: never
Joined: Jul 06, 2017 1:56 am
Full Name: zul
Contact:
Post
by zul » Jul 28, 2017 12:38 am
this post
hi, thanks for the reply.
The tape is not in protected. So i need to use the same tape until the protection period is over?
Last night i scheduled a job backup to tape in another tape, Tape 3. But it shows the same notification as i post above.
Kindly advise me what to do.
Tq
Shestakov
Veteran
Posts: 7328 Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:
Post
by Shestakov » Jul 28, 2017 11:55 am
this post
If tape is not protected, it can be used for writing.
So i need to use the same tape until the protection period is over?
Didn`t get it. When Tape 2 is full VBR tries to continue writing on Tape 3 if the tape is not protected from writing.
You may also contact the support team to get assistance.
Thanks!
Users browsing this forum: No registered users and 46 guests