Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
PostBE
Influencer
Posts: 13
Liked: 4 times
Joined: Nov 14, 2013 1:46 am
Full Name: Dale Clyne
Contact:

Monthly backup job to tape scheduling

Post by PostBE »

What is the best way to do this as I have a Weekly backup to tape job that runs every Friday but I also want to create a Monthly backup to tape job that will run on the last Friday of the month.
As these will conflict once a month what is the best way to do this as Backup Exec you could pick which job superseded the other.
Dima P.
Product Manager
Posts: 14716
Liked: 1703 times
Joined: Feb 04, 2013 2:07 pm
Full Name: Dmitry Popov
Location: Prague
Contact:

Re: Monthly backup job to tape scheduling

Post by Dima P. »

Dale,
It is possible with the following options:

- Media pool > create media set for each backup session
- Job schedule > Run job daily at these days > Friday
- Specify the desired retention (at least one week)

Now once you want to archive a monthly set of tapes with backups – use protect option on the last media set, and such tapes won’t be overwritten by retention. When no longer needed, bring this tapes back to the library and unprotect them – it will be erased and used by the original media pool for further backups.
veremin
Product Manager
Posts: 20400
Liked: 2298 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Monthly backup job to tape scheduling

Post by veremin »

Be aware that tape protection can be also enabled via Enable-VBRTapeProtection commandlet, so that, mediums belonging to the month's latest mediaset can be automatically protected. Thanks.
PostBE
Influencer
Posts: 13
Liked: 4 times
Joined: Nov 14, 2013 1:46 am
Full Name: Dale Clyne
Contact:

Re: Monthly backup job to tape scheduling

Post by PostBE »

Thanks all I will take a look at these suggestions.
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Monthly backup job to tape scheduling

Post by Shestakov »

You are welcome, Dale.
Also, this post can be useful.
ericlau
Lurker
Posts: 2
Liked: never
Joined: Oct 27, 2017 9:46 pm
Full Name: Eric Lau
Contact:

Re: Monthly backup job to tape scheduling

Post by ericlau »

I have the same similar situation. I have a Weekly Backup of every Friday and a Monthly Backup of the last Friday. Weekly has a different retention period than Monthly. How can I skip the last Weekly Friday?
I tried to follow the suggestions above.
-------------------------------------------------------------------
Media pool > create media set for each backup session
-Job schedule > Run job daily at these days > Friday
-Specify the desired retention (at least one week)
Now once you want to archive a monthly set of tapes with backups – use protect option on the last media set
-------------------------------------------------------------------
I am not able to follow the last sentence "Now once you want to archive a monthly set of tapes with backups – use protect option on the last media set". Can you explain a little more.
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Monthly backup job to tape scheduling

Post by Shestakov »

Hello Eric and welcome to the community!
This topic is 3 years old and the suggested workaround is not needed now due to Tape GFS Media Pools released from that time.
ericlau
Lurker
Posts: 2
Liked: never
Joined: Oct 27, 2017 9:46 pm
Full Name: Eric Lau
Contact:

Re: Monthly backup job to tape scheduling

Post by ericlau »

GFS Media Pools is for Enterprise only. Unfortunately I have only the Standard.
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Monthly backup job to tape scheduling

Post by Shestakov »

Without GFS retention there is no easy workaround to avoid duplication. The one I can think of is a powershell script starting by windows scheduler which disables the job on 24th of every month and enables it back on 1st of the next month.
As far as I remember all suggested quasi-tape GFS workarounds worked with backup duplication.
Thanks.
Post Reply

Who is online

Users browsing this forum: No registered users and 12 guests