Today i see something strange while an Backup To Disk Job is running .
The Total File Size from the two Backup Repositorys from which i Backup Files to Tape is araound 7.7 TB as you can see :


But whe you take an look in my running Backup Job you can see the that till this Moment 12.2 TB Read, 10.8 TB Processed by 79% , Transfered 10,8 TB ????

Why is this a so big differnece between this values ?
On the last Weekend it was only : Processed 6.9 TB 100% , 7.6 TB Read and 6.9 TB Transfered .

Under the Week it is impossible to add 3 TB to my File Backup Repositorys .
Thanks for Solutions .