Tape job fails if tapes in changer are full

Discussions specific to tape backups

Tape job fails if tapes in changer are full

Veeam Logoby remko.de.koning » Wed May 02, 2018 7:14 am

Hi,

We basically have two kinds of tape jobs.

Low-Retention
These jobs are just for air-gap backups. The tapes last for about 2-3 weeks before they are recycled.

High-Retention
These jobs are for longer storage

The tape library (HP command View 1/8 G2 Autoloader) holds both kinds of tape. 8 tapes in total.
When one of the media pool tapes are full, it pauses the backup job until new tapes are loaded.
When the tapes are loaded, Veeam continues the backup job.

So far so good, but any pending jobs of the other media pools are cancelled as soon as the tapes in the tape library are changed with the error "No Tape Libraries are online"
I am trying to understand why. Can anyone help me out here?

Thanks for any thoughts you might have.
remko.de.koning
Enthusiast
 
Posts: 77
Liked: 13 times
Joined: Wed May 21, 2014 12:15 pm
Full Name: Remko de Koning

Re: Tape job fails if tapes in changer are full

Veeam Logoby Dima P. » Wed May 02, 2018 11:16 am

Hello remko.de.koning.

remko.de.koning wrote:When one of the media pool tapes are full, it pauses the backup job until new tapes are loaded.
When the tapes are loaded, Veeam continues the backup job.

Tape job waits for a media to be inserted if your media pool has no free tapes left.

remko.de.koning wrote:So far so good, but any pending jobs of the other media pools are cancelled as soon as the tapes in the tape library are changed with the error "No Tape Libraries are online"

Can you elaborate how you are loading media to your library? Thanks.
Dima P.
Veeam Software
 
Posts: 7607
Liked: 548 times
Joined: Mon Feb 04, 2013 2:07 pm
Location: Prague
Full Name: Dmitry Popov

Re: Tape job fails if tapes in changer are full

Veeam Logoby remko.de.koning » Wed May 02, 2018 11:37 am

Can you elaborate how you are loading media to your library? Thanks.


In the "operations" section of the tape library is an eject "left" or "right" option (Two magazines).
When the magazine is ejected the library comes offline for a few minutes and then it comes back online.
The job that was currently running continues after this while the jobs for the other media pool fails.

Should I initiate an eject somewhere from Veeam?
remko.de.koning
Enthusiast
 
Posts: 77
Liked: 13 times
Joined: Wed May 21, 2014 12:15 pm
Full Name: Remko de Koning


Return to Tape



Who is online

Users browsing this forum: No registered users and 6 guests