Discussions related to exporting backups to tape and backing up directly to tape.
Post Reply
WinstonWolf
Veteran
Posts: 284
Liked: 11 times
Joined: Jan 06, 2011 8:33 am
Contact:

Two Tape Jobs with two Media Pools or One Tape Job and one Media Pool ?

Post by WinstonWolf »

Hello ,
We have 4 B2D Jobs .
Job 1 , Backup Size 9,77 TB
Job 2 , Backup Size 3,16 TB
Job 3 , Backup Size 6,1 TB
Job 4 , Backup Size 315 GB

We have also an HP Tape Library MSL4048 with 2 LTO8 Drives .

What is now the Best way to Backup our B2D Backups to Tape ?

With one Tape Job to One Media Pool with Tape Parallel Processing to the two Tape Drives or

2 Tape Jobs who Backup in 2 Media Pools and every Job use one Tape Drive.


Thanks
PetrM
Veeam Software
Posts: 3726
Liked: 623 times
Joined: Aug 28, 2013 8:23 am
Full Name: Petr Makarov
Location: Prague, Czech Republic
Contact:

Re: Two Tape Jobs with two Media Pools or One Tape Job and one Media Pool ?

Post by PetrM »

Hello,

I believe both methods are equally efficient, especially if you don't want to have different schedule to process source backups. In this case, I don't see a reason to multiply entities and I'd stick with a "single-job" approach.

Thanks!
Post Reply

Who is online

Users browsing this forum: No registered users and 18 guests