Hello,
i just want to confirm if this is on purpose or a bug:
I just installed VAW 2.0 on a Server 2008 R2. I installed the 6 Month Trial Licence and did choose "Server".
When I use local Storage as the target i have detailed scheduling options (hourly backup). When i choose Veeam Repository as the target, i have the standard "Daily at xx:xx" Schedule Option.
I already tried revoking the licence and restarting the Veeam Agent Service.
Is this on purpose? Why?
Best Regards
-
- Expert
- Posts: 112
- Liked: 10 times
- Joined: Nov 26, 2014 2:37 pm
- Contact:
-
- Expert
- Posts: 112
- Liked: 10 times
- Joined: Nov 26, 2014 2:37 pm
- Contact:
Re: Veeam Agent Server Edition - Missing Scheduling Options
Nevermind, i found the solution. When connecting to a VBR Server it silently switches the licence back to "free". I installed the VAW Licence on the VBR Server and schedule Options are not available
-
- Product Manager
- Posts: 14726
- Liked: 1707 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: Veeam Agent Server Edition - Missing Scheduling Options
True story, when you target agent to backup server, last start to act as a license distribution server for this agent. If it has not licenses – agent automatically get a free license which overwrites the existing agent license. Retention and schedule options are different in workstation and server editions and to avoid the unpredictable/accidental merge after license swap we disable the schedule when you edition is modified.
Who is online
Users browsing this forum: No registered users and 11 guests