Then a backupcopy job at 12am.
Worked as expected until one time one VM missed the 12am window.
Now everyday the backupcopy of that VM occurs shortly after 6:30pm then the others start at 12am.
Can you force a backup copy job to redo all VM copies at the start time (12am) ? There would be no change to that one vm but I want the offsite copy to occur at 12am.
The last 7 times the one VM occurs shortly after 6:30pm ( when the vm backup is done)
This is how I would want it to work once after an issue but on the next run it should go back to 12am, Veeam knows becuase a warning that no changes occured.
Code: Select all
BackupSync job: Syn-2008-BC_DR
Created by VEEAM247\vmadmin at 8/27/2013 8:06:45 AM.
Success
2 of 2 VMs processed
Tuesday, September 10, 2013 12:00:27 AM
Success 2 Start time 12:00:27 AM Total size 1000.0 GB Backup size 939.6 MB
Warning 0 End time 12:00:01 AM (+1) Data read 2.4 GB Dedupe 1.0x
Error 0 Duration 23:59:33 Transferred 923.0 MB Compression 2.7x
Details
Name Status Start time End time Size Read Transferred Duration Details
Ser-2008 Success 12:01:51 AM 12:03:21 AM 380.0 GB 1.2 GB 564.7 MB 0:01:29
SQL-2008 Success 6:37:50 PM 6:39:04 PM 620.0 GB 1.2 GB 358.3 MB 0:01:14
BackupSync job: Syn-2008-BC_DR
Created by VEEAM247\vmadmin at 8/27/2013 8:06:45 AM.
Warning
2 of 2 VMs processed
Wednesday, September 11, 2013 12:00:05 AM
Success 1 Start time 12:00:05 AM Total size 760.0 GB Backup size 0.0 KB Job has failed unexpectedly
Warning 1 End time 5:25:00 PM Data read 1.2 GB Dedupe 1.0x
Error 0 Duration 17:24:54 Transferred 982.7 MB Compression 1.0x
Details
Name Status Start time End time Size Read Transferred Duration Details
Ser-2008 Success 12:02:37 AM 12:03:53 AM 380.0 GB 1.2 GB 491.3 MB 0:01:15
SQL-2008 Warning 12:01:40 AM 5:25:00 PM 0.0 KB 0.0 KB 0.0 KB 17:23:19 Latest restore point is already copied ****this is where the vm needs to be flagged to wait until next cycle.
Task has been cancelled
BackupSync job: Syn-2008-BC_DR
Created by VEEAM247\vmadmin at 8/27/2013 8:06:45 AM.
Success
1 of 1 VMs processed
Wednesday, September 11, 2013 5:25:19 PM
Success 1 Start time 5:25:19 PM Total size 620.0 GB Backup size 1.9 GB
Warning 0 End time 12:00:06 AM (+1) Data read 3.9 GB Dedupe 1.0x
Error 0 Duration 6:34:46 Transferred 1.4 GB Compression 2.7x
Details
Name Status Start time End time Size Read Transferred Duration Details
SQL-2008 Success 6:38:30 PM 6:41:43 PM 620.0 GB 3.9 GB 1.4 GB 0:03:12
BackupSync job: Syn-2008-BC_DR
Created by VEEAM247\vmadmin at 8/27/2013 8:06:45 AM.
Success
2 of 2 VMs processed
Thursday, September 12, 2013 12:00:15 AM
Success 2 Start time 12:00:15 AM Total size 1000.0 GB Backup size 1.1 GB
Warning 0 End time 12:00:00 AM (+1) Data read 2.5 GB Dedupe 1.0x
Error 0 Duration 23:59:44 Transferred 1.1 GB Compression 2.3x
Details
Name Status Start time End time Size Read Transferred Duration Details
Ser-2008 Success 12:02:51 AM 12:04:30 AM 380.0 GB 1.3 GB 741.3 MB 0:01:38
SQL-2008 Success 6:37:52 PM 6:39:04 PM