Hello
still using version 8 of B&R and im confused, how to configure once a month first weekend (lets say saturday).
As in backup copy job the schedule is not really best for my needs, i would like to ask how to configure it.
Our setup :
1 B&R backup server in decentral location with backup and wan proxy (source ~3TB of data on backup server, physical).
1 B&R proxy and wan proxy in central DC (destination physical server with a lot of storage).
currently slow WAN in between, so really cant test during the day and try various configurations of the schedule.
Each first weekend of the month, make a copy of all vm's (from backup job/infrastructure/files...does not really matter) to our central backup server.
Till now i have not tested the version 9, so second question is if i can have source v9 and destination v8
thnx
-
- Enthusiast
- Posts: 28
- Liked: 1 time
- Joined: Jan 14, 2016 11:34 am
- Full Name: Peter Vilagi
- Contact:
-
- Product Manager
- Posts: 20413
- Liked: 2301 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: backup copy job offsite via slow WAN
A backup copy job with monthly sync interval might answer your requirements. It might be also worth seeding a job first to avoid initial full run via slow WAN link.
Thanks.
You will have to add target as a backup repository to a v9 console. This operation will automatically install v9 components on the target server. After that, the updated components won't work with previous version of backup server. So, the answer is no.Till now i have not tested the version 9, so second question is if i can have source v9 and destination v8
Thanks.
Who is online
Users browsing this forum: Bing [Bot], restore-helper and 152 guests