Comprehensive data protection for all workloads
Post Reply
tekno
Enthusiast
Posts: 28
Liked: 1 time
Joined: Jan 14, 2016 11:34 am
Full Name: Peter Vilagi
Contact:

backup copy job offsite via slow WAN

Post by tekno »

Hello

still using version 8 of B&R and im confused, how to configure once a month first weekend (lets say saturday).
As in backup copy job the schedule is not really best for my needs, i would like to ask how to configure it.
Our setup :

1 B&R backup server in decentral location with backup and wan proxy (source ~3TB of data on backup server, physical).
1 B&R proxy and wan proxy in central DC (destination physical server with a lot of storage).

currently slow WAN in between, so really cant test during the day and try various configurations of the schedule.

Each first weekend of the month, make a copy of all vm's (from backup job/infrastructure/files...does not really matter) to our central backup server.

Till now i have not tested the version 9, so second question is if i can have source v9 and destination v8

thnx
veremin
Product Manager
Posts: 20283
Liked: 2258 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: backup copy job offsite via slow WAN

Post by veremin »

A backup copy job with monthly sync interval might answer your requirements. It might be also worth seeding a job first to avoid initial full run via slow WAN link.
Till now i have not tested the version 9, so second question is if i can have source v9 and destination v8
You will have to add target as a backup repository to a v9 console. This operation will automatically install v9 components on the target server. After that, the updated components won't work with previous version of backup server. So, the answer is no.

Thanks.
Post Reply

Who is online

Users browsing this forum: doktorteknik, Google [Bot], smexiko, tomo yasu and 139 guests