-
- Service Provider
- Posts: 37
- Liked: never
- Joined: Aug 20, 2015 1:37 pm
- Full Name: Kyle Slaughter
- Contact:
Backup Copy Job Scheduling Question
I have a backup copy job using a local backup job as the source. The source backup job is running every 6 hours (6 PM, Midnight, 6 AM, Noon) and has 84 restore points. We would like to have the same retention on the backup copy job...wondering how I should schedule this. Do I just set the copy interval on the backup copy job to copy every 6 hours starting at like midnight? And then keep the number of restore points on the copy job to 84 as well? Thanks!
-
- Veteran
- Posts: 298
- Liked: 85 times
- Joined: Feb 16, 2017 8:05 pm
- Contact:
Re: Backup Copy Job Scheduling Question
I have several backup jobs that run every six hours. My Backup Copy Jobs (BCJ) also run every six hours. For clarity, these BCJs run continuously.
You can loosely time your BCJ to run after your source backup job has completed. After you've built and saved your BCJ (without running it), and know when the source has finished, just right click on the BCJ and select "Sync now" from the popup menu. After the first successful run of the BCJ, Veeam will run this job every six hours. Easy.
You should be able to have the same number of restore points on your BCJ.
Good luck.
You can loosely time your BCJ to run after your source backup job has completed. After you've built and saved your BCJ (without running it), and know when the source has finished, just right click on the BCJ and select "Sync now" from the popup menu. After the first successful run of the BCJ, Veeam will run this job every six hours. Easy.
You should be able to have the same number of restore points on your BCJ.
Good luck.
-
- Service Provider
- Posts: 37
- Liked: never
- Joined: Aug 20, 2015 1:37 pm
- Full Name: Kyle Slaughter
- Contact:
Re: Backup Copy Job Scheduling Question
Thanks and kind of what I thought. We had left the default backup copy job interval to every 24 hours, and I noticed we only had restore points for every 24 hours, not every 6 hours (as the source job has) like we would like. Didn't realize the copy jobs were actually combining all of those .vibs apparently.
-
- Product Manager
- Posts: 20541
- Liked: 2349 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Backup Copy Job Scheduling Question
Your assumption is correct. Backup copy job doesn't copy backup chain as a whole, but rather synthetically creates required restore points in "target" location from VM data in source backup repositories. So, within copy interval backup copy job creates only one restore point. Thanks.
Who is online
Users browsing this forum: Ahrefs [Bot], Baidu [Spider] and 106 guests