I have BackupCopy jobs running continuously, so when a job finished they copy new data to my DR site.
I have a script at the end of my last Backup Job that runs SureBackup on each of my Backup Jobs.
Right now, I have the script disabled, because I had to rebuild my SureBackup jobs.
If I enable the script, what will happen if a SureBackup job tries to run while a BackupCopy Job is running? Can they share the file at all? If so, will they both be very bogged down?
-
- Enthusiast
- Posts: 50
- Liked: 6 times
- Joined: Aug 17, 2012 12:31 pm
- Contact:
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Can SureBackup jobs and BackupCopy jobs run smultaneousl
It’s highly possible that this scenario will work, since both backup copy and surebackup job only read corresponding backup files. Nevertheless, this hasn’t been tested, so, you should try it yourself and see whether it works or not.
Anyway, even if backup copy job can’t copy the restore point, it won’t fail but rather will wait till the Surebackup activity is finished, and, then, move the restore point offsite.
Thanks.
Anyway, even if backup copy job can’t copy the restore point, it won’t fail but rather will wait till the Surebackup activity is finished, and, then, move the restore point offsite.
Thanks.
-
- Enthusiast
- Posts: 50
- Liked: 6 times
- Joined: Aug 17, 2012 12:31 pm
- Contact:
Re: Can SureBackup jobs and BackupCopy jobs run smultaneousl
Just wanted to report in that SureBackup and a BackupCopyJob can and DO work simultaneously.
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Can SureBackup jobs and BackupCopy jobs run smultaneousl
Thank you for coming back and confirming that the ability of SureBackup and Backup Copy jobs to run simultaneously; much appreciated. Thanks.
Who is online
Users browsing this forum: No registered users and 67 guests