Comprehensive data protection for all workloads
Post Reply
Grevers
Novice
Posts: 3
Liked: never
Joined: Jan 27, 2015 1:08 am
Full Name: Greg Evers
Contact:

Combine Multiple VMs in to a single job

Post by Grevers »

Hi,

We currently have an individual backup job for each individiual server.

I was wondering if there was a way of combining multiple servers in to a single without losing the backup chain for the servers. Is it possible to merge multiple backup jobs in to a single backup job?

I am currently performing forward incremental backups for each server, so I would like to keep the chain in place.

Does anyone know if this is possible?

I would appreciate any assistance that you may have.
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Combine Multiple VMs in to a single job

Post by veremin »

Create a backup copy job selecting all backups jobs as its source. Let it run at least one cycle and then disable it. After that create a new backup job and map it to data created by the backup copy job.

Thanks.
Grevers
Novice
Posts: 3
Liked: never
Joined: Jan 27, 2015 1:08 am
Full Name: Greg Evers
Contact:

Re: Combine Multiple VMs in to a single job

Post by Grevers »

Thanks, but I was just wondering if that will keep the backup chain, or will it create a brand new chain?

For instance, if we have Server 1 that has 200 restore points and Server 2 that has 200 restore points, when we create the backup job will we be able to manage all of the restore points (ie, delete the last restore point if the server is only configured to keep 200 restore points?), or will it create a new backup chain and we'll have to manually manage the previous number of restore points?
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Combine Multiple VMs in to a single job

Post by foggy »

The new job will start a brand new chain, you will have to manage retention of the old restore points manually (or at least script it).
Grevers
Novice
Posts: 3
Liked: never
Joined: Jan 27, 2015 1:08 am
Full Name: Greg Evers
Contact:

Re: Combine Multiple VMs in to a single job

Post by Grevers »

Thanks for the clarification, I was afraid that was going to be the response.
ebarrios08
Novice
Posts: 7
Liked: never
Joined: Jan 13, 2014 7:13 pm
Full Name: Edsel Barrios
Contact:

[MERGED] Merging backup jobs

Post by ebarrios08 »

I have several backup jobs that I created when I started working with Veeam. They have been working wonderfully. At this point I was wondering if there was a way to consolidate the jobs into a couple of jobs. I don't want to re create jobs. If there is no way of doing this maybe, it could be added to a future release.
Shestakov
Veteran
Posts: 7328
Liked: 781 times
Joined: May 21, 2014 11:03 am
Full Name: Nikita Shestakov
Location: Prague
Contact:

Re: Merging backup jobs

Post by Shestakov »

Hello Edsel,
You can add vms from one jobs to another jobs. Existing backups will be deleted in accordance to its retention.
Note that it`s recommended to group vms of the same OS and applications to get better deduplication results.
Thanks!
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Combine Multiple VMs in to a single job

Post by foggy »

Edsel, you can do what you're after with the help of backup copy jobs. You can create a backup copy job to merge several backup jobs into a single VBK file and then use that file to seed the new combined backup job.
ceez
Enthusiast
Posts: 59
Liked: 3 times
Joined: Feb 18, 2014 2:10 pm
Full Name: Cesar
Contact:

[MERGED] Moving already backed up servers to a different bku

Post by ceez »

Hello everyone,

So I am consolidating 3 servers that reside on 3 different backup jobs to a single backup job.

I want to be able to keep the restore points of the current backup jobs onto the new job I"ll be creating. Is it possible to MAP those jobs to a new job?

Thanks
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Combine Multiple VMs in to a single job

Post by foggy »

Yes, this is possible, please see above.
npandav
Novice
Posts: 5
Liked: never
Joined: Jan 09, 2018 4:16 pm
Full Name: Naresh Pandav
Contact:

[MERGED] Merge Backup Jobs

Post by npandav »

Is there a way of merging two backup jobs into one while maintaining the backup chain?
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Merge Backup Jobs

Post by veremin »

You can create a backup copy job to produce single backup file combining the latest state of both backup chains. Thanks.
npandav
Novice
Posts: 5
Liked: never
Joined: Jan 09, 2018 4:16 pm
Full Name: Naresh Pandav
Contact:

Re: Merge Backup Jobs

Post by npandav »

Thanks.

Is there a way of moving\merging the backup chain into another job? We are trying to consolidate backups into few jobs so want to move VM's from several jobs into one new job.
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Combine Multiple VMs in to a single job

Post by foggy »

Hi Naresh, you cannot combine existing backup chains, but you can rearrange VMs in your jobs using the way mentioned by Vladimir to continue with less jobs. Some details above.
kunniyoor
Enthusiast
Posts: 33
Liked: never
Joined: Mar 15, 2015 6:47 am
Full Name: Krishnakuamr
Contact:

[MERGED] How can we attach the backup sets created by old job for individual vm to the new job set.

Post by kunniyoor »

May be weird, but faced this challenge. We r having multiple vm's getting backed up daily through more than 20 backup jobs. Our client want to consolidate it to max 5 backup jobs which should protect the same vm's.
How can we attach the backup sets created by old job for individual vm to the new job set. So that the new job should not process a fresh full backup.

If not available in current releases. May we can expect this in future release. It's a pain when the vm's are of 5tb in size and need to shift them from one job to another.

Krish
Bahrain
HannesK
Product Manager
Posts: 14844
Liked: 3086 times
Joined: Sep 01, 2014 11:46 am
Full Name: Hannes Kasparick
Location: Austria
Contact:

Re: How can we attach the backup sets created by old job for individual vm to the new job set.

Post by HannesK »

Hello,
unfortunately that's not possible today. Yes, we are aware of that situation and a future release will eventually fix it (I cannot say anything about the timeline right now).

Best regards,
Hannes
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Combine Multiple VMs in to a single job

Post by foggy »

You can seed the new job with the help of a backup copy though, see above.
kunniyoor
Enthusiast
Posts: 33
Liked: never
Joined: Mar 15, 2015 6:47 am
Full Name: Krishnakuamr
Contact:

Re: Combine Multiple VMs in to a single job

Post by kunniyoor »

If backup copy can do the magic, that's great.. But our problem really lies with two vms with 5tb in size and repository is having less than 3tb free space. In that case backup copy is not going to help.
Post Reply

Who is online

Users browsing this forum: No registered users and 83 guests