Comprehensive data protection for all workloads
Post Reply
polsen6
Lurker
Posts: 2
Liked: never
Joined: Dec 01, 2015 9:02 am
Contact:

Copy Job and GFS

Post by polsen6 »

I a have a daily job running as Incremental with a weekly Active Full on saturdays.
To that job I have added a Secondary Target to get an offsite copy every day.
Should I change something at the Backup job in order to get a daily copy?

How should the properties of the Copy Job be set to achieve 7 daily copies?
Job: Copy every x days?
Target: How many restore points?
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Copy Job and GFS

Post by veremin »

Copy every 1 day, 7 restore points to keep.
polsen6
Lurker
Posts: 2
Liked: never
Joined: Dec 01, 2015 9:02 am
Contact:

Re: Copy Job and GFS

Post by polsen6 »

And how about the daily backup job, could it be any type ie. reverse incremental, incremental or incremental synth - with or without active full? Or must it be a certain type to create daily copies using the backup copy job?
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Copy Job and GFS

Post by veremin »

Correct, it could be of any type. With or without periodic full backups.

Backup copy job is not about direct copying of restore points, but more about synthetically synthesizing required restore points in "target" location from VM data in source backup repositories.

Check this section of User Guide for more information regarding that.

Thanks.
Post Reply

Who is online

Users browsing this forum: Amazon [Bot], Google [Bot], Semrush [Bot] and 90 guests