Comprehensive data protection for all workloads
Post Reply
wmed1701
Lurker
Posts: 2
Liked: never
Joined: Aug 03, 2020 8:36 pm
Full Name: Wayne Medeiros
Contact:

[Feature Request] Detailed Backup Copy Job Scheduling

Post by wmed1701 »

Hello Veeam Devs - I would like to request more targeted scheduling of Backup Copy Jobs. Instead of having "every X minutes/hours/days" and a "starting hour" it would be nice to have the same type of scheduling that the primary backup jobs allow, including specific days/times of the week, running after another job, etc. This would make juggling job schedules easier. Thank you!
Gostev
Chief Product Officer
Posts: 31814
Liked: 7302 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: [Feature Request] Detailed Backup Copy Job Scheduling

Post by Gostev »

Hello, can you explain why do you need to "juggle job schedules" in the first place? Are you not interested to just perform the copy as soon as possible? Thanks.
Post Reply

Who is online

Users browsing this forum: Bing [Bot], Google [Bot] and 56 guests