Hi.
I was wondering, my Veeam Backup & Replication is configured to do 1 full backup initially, then 7 incrementals (1 for each day of the week), and then, 7 days after the first full backup, do a synthetic backup af all of this. What happens if some incrementals are missing (computer shutting down while on holidays or stuff like this) ?
-
- Lurker
- Posts: 2
- Liked: 1 time
- Joined: Jul 30, 2021 12:37 pm
- Contact:
-
- Veeam Software
- Posts: 3622
- Liked: 608 times
- Joined: Aug 28, 2013 8:23 am
- Full Name: Petr Makarov
- Location: Prague, Czech Republic
- Contact:
Re: Few incremental missing
Hello,
The synthetic full will be created from existing valid restore points on the day it's scheduled to run. The obsolete backup chain will be removed once the actual one reaches the number of restore points specified in retention policy setting, more information here.
Thanks!
The synthetic full will be created from existing valid restore points on the day it's scheduled to run. The obsolete backup chain will be removed once the actual one reaches the number of restore points specified in retention policy setting, more information here.
Thanks!
-
- Lurker
- Posts: 2
- Liked: 1 time
- Joined: Jul 30, 2021 12:37 pm
- Contact:
Re: Few incremental missing
Thanks a lot for the quick response !