Hi,
one of my backups jobs is showing some unusual message:
It is shown as running in the Last 24 Hours section with the statement "99% completed" in the Status column.
In the job details however it states:
13.09.2017 12:25:20 :: Job finished at 13.09.2017 12:25:20
That was more than 8h ago and jobs which were schedules afterwards started.
Any explanation?
BR
Frank
-
- Expert
- Posts: 110
- Liked: 9 times
- Joined: Nov 30, 2016 9:48 pm
- Full Name: Frank Knappe
- Contact:
-
- Expert
- Posts: 110
- Liked: 9 times
- Joined: Nov 30, 2016 9:48 pm
- Full Name: Frank Knappe
- Contact:
Re: Job stucks at 99% completed
I've just noticed something more strange.
The above statement is true, when I look at the Veeam console directly on the VBR server.
When I look at the Veeam console on my local laptop it show the above mentioned job as completed and also the jobs afterwards were performed.
I've made screen shots which I can provide if needed.
The above statement is true, when I look at the Veeam console directly on the VBR server.
When I look at the Veeam console on my local laptop it show the above mentioned job as completed and also the jobs afterwards were performed.
I've made screen shots which I can provide if needed.
-
- Veeam Software
- Posts: 1818
- Liked: 655 times
- Joined: Mar 02, 2012 1:40 pm
- Full Name: Timothy Dewin
- Contact:
Re: Job stucks at 99% completed
You could try to refresh the frame by pushing F5 or reopen the console. if the issue persists, please open a call with our support team
-
- Expert
- Posts: 110
- Liked: 9 times
- Joined: Nov 30, 2016 9:48 pm
- Full Name: Frank Knappe
- Contact:
Re: Job stucks at 99% completed
F5 settled the problem. I was under the impression that selecting a different View (Running -> Success) would already trigger a refresh of the frame.
BR
Frank
BR
Frank
Who is online
Users browsing this forum: Bing [Bot] and 65 guests