Hi,
I'm still pretty new to Veeam B&R.
I want to move some Backup Jobs to a new repository . Both repositories are the same size (72 TB), direct attached and formatted in ReFS, but when copying the backup files to the new repository, i now ran out of space.
I assume because of the Advanced ReFS integration there was much more space that could be "used" on the old repository (190 TB).
Does this not automatically apply to the new repository? Currently i can't copy Job Files to the new repository when they have a bigger size than space left.
Thanks in advance
-
- Novice
- Posts: 3
- Liked: never
- Joined: Dec 20, 2022 8:27 am
- Full Name: Basti
- Contact:
-
- Product Manager
- Posts: 9716
- Liked: 2565 times
- Joined: May 13, 2017 4:51 pm
- Full Name: Fabian K.
- Location: Switzerland
- Contact:
Re: Moving Jobs to a new Repository - not enough capacity
Hi Basti
Welcome to the forum.
Yes, you are correct. Currently when you move files to a new repository, they will use the entire space.
In V11, you must use a block cloning tool for the data migration to keep the space savings.
If you can wait for V12 in early Q1, you will be able to move the backups with Veeam (VeeaMover) and keep the space savings from reFS.
Thanks,
Fabian
Welcome to the forum.
Yes, you are correct. Currently when you move files to a new repository, they will use the entire space.
In V11, you must use a block cloning tool for the data migration to keep the space savings.
If you can wait for V12 in early Q1, you will be able to move the backups with Veeam (VeeaMover) and keep the space savings from reFS.
Thanks,
Fabian
Product Management Analyst @ Veeam Software
-
- Novice
- Posts: 3
- Liked: never
- Joined: Dec 20, 2022 8:27 am
- Full Name: Basti
- Contact:
Re: Moving Jobs to a new Repository - not enough capacity
Hi Fabian,
thanks for the fast reply. I will copy the files back to the old repository and wait for Version 12.
thanks for the fast reply. I will copy the files back to the old repository and wait for Version 12.
-
- Product Manager
- Posts: 9716
- Liked: 2565 times
- Joined: May 13, 2017 4:51 pm
- Full Name: Fabian K.
- Location: Switzerland
- Contact:
Re: Moving Jobs to a new Repository - not enough capacity
You're welcome.
Please note, copying back will also use the entire size of the copied files. Please make sure that you have enough storage.
You can also just copy the the newest chain to the new repository and remap the backup jobs. Keep the old repository until the backups are out of their retention.
Best,
Fabian
Please note, copying back will also use the entire size of the copied files. Please make sure that you have enough storage.
You can also just copy the the newest chain to the new repository and remap the backup jobs. Keep the old repository until the backups are out of their retention.
Best,
Fabian
Product Management Analyst @ Veeam Software
-
- Novice
- Posts: 3
- Liked: never
- Joined: Dec 20, 2022 8:27 am
- Full Name: Basti
- Contact:
Re: Moving Jobs to a new Repository - not enough capacity
I did'nt delete the old backup files so I'll just change the repository in the job settings again.
I started copying ~2 weeks ago so there won't be much data loss.
I started copying ~2 weeks ago so there won't be much data loss.
Who is online
Users browsing this forum: No registered users and 55 guests