Hi,
Because of our working days and hours and traffic limitations I need some jobs to run in different schedules. For example I like a job to be run
5:00 on Fridays and Saturdays
21:00 on other days of week
But I cannot find this. just one time schedule is available
Is it possible or we should request this feature ?
Thanks
Because of our working days and hours and traffic limitations I need some jobs to run in different schedules. For example I like a job to be run
5:00 on Fridays and Saturdays
21:00 on other days of week
But I cannot find this. just one time schedule is available
Is it possible or we should request this feature ?
Thanks
-
- Veteran
- Posts: 7328
- Liked: 781 times
- Joined: May 21, 2014 11:03 am
- Full Name: Nikita Shestakov
- Location: Prague
- Contact:
Re: Multiple Schedules / Different times for each day
Hi!
That is not possible for now. We will take your feature request into account.
Thanks!
That is not possible for now. We will take your feature request into account.
Thanks!
-
- Influencer
- Posts: 23
- Liked: 1 time
- Joined: Jul 01, 2017 4:35 am
- Full Name: Mhd
- Contact:
Re: Multiple Schedules / Different times for each day
Thanks Shestakov. This is a very useful feature which can help so many people like me a lot. This feature is available in many software who needs scheduling.
-
- Veteran
- Posts: 7328
- Liked: 781 times
- Joined: May 21, 2014 11:03 am
- Full Name: Nikita Shestakov
- Location: Prague
- Contact:
Re: Multiple Schedules / Different times for each day
That makes sense. We will consider adding the feature in future versions.
Thanks!
Thanks!
-
- Veeam Software
- Posts: 649
- Liked: 170 times
- Joined: Dec 10, 2012 8:44 am
- Full Name: Nikita Efes
- Contact:
Re: Multiple Schedules / Different times for each day
Actually with a little creativity it is doable in current version.
Just schedule job to run hourly and permit only 5:00 - 6:00 backup window at Friday and Saturday and 21:00-22:00 all other days.
Make sure that you are using window that is configured via Schedule button near in the Periodically every radiobutton, not in "Terminate job if it exceeds allowed backup window".
If you will select the one under Schedule, the job will start only at times you said and continue working even if it will need more than 1 hour, meanwhile if you choose Terminate option, job will be terminated in the case of running more than 1 hour.
Something like that:
Just schedule job to run hourly and permit only 5:00 - 6:00 backup window at Friday and Saturday and 21:00-22:00 all other days.
Make sure that you are using window that is configured via Schedule button near in the Periodically every radiobutton, not in "Terminate job if it exceeds allowed backup window".
If you will select the one under Schedule, the job will start only at times you said and continue working even if it will need more than 1 hour, meanwhile if you choose Terminate option, job will be terminated in the case of running more than 1 hour.
Something like that:
-
- Influencer
- Posts: 23
- Liked: 1 time
- Joined: Jul 01, 2017 4:35 am
- Full Name: Mhd
- Contact:
Re: Multiple Schedules / Different times for each day
Seems to be working. I'll work on it. Thanks
But anyway I think this should be directly available without tricky methods like this
But anyway I think this should be directly available without tricky methods like this
-
- Service Provider
- Posts: 326
- Liked: 78 times
- Joined: Mar 16, 2015 4:00 pm
- Full Name: David Rubin
- Contact:
Re: Multiple Schedules / Different times for each day
I'd like to +1 this. We have some jobs that are chained together, but we'd like to also ensure that they ALL run at 10pm.
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Multiple Schedules / Different times for each day
David, are you OK with scripting? If so, it should be quite easy to create and schedule a tiny script that:
- Gets required jobs
- Execute them outside of already assigned schedule
Thanks!
- Gets required jobs
- Execute them outside of already assigned schedule
Thanks!
-
- Service Provider
- Posts: 326
- Liked: 78 times
- Joined: Mar 16, 2015 4:00 pm
- Full Name: David Rubin
- Contact:
Re: Multiple Schedules / Different times for each day
I could probably put something like this together as a workaround, but that removes the single pane of management (as scheduling is now handled in two separate locations), not to mention that it looks like it might somehow lead to double-run jobs, as 'zadrian' mentions here.
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Multiple Schedules / Different times for each day
If you don't use -StartChainedJobs switch, then, you will avoid double-run. Anyway, consider your vote counted. Thanks!