Hi,
about 2 weeks ago i installed Veeam R&D and I am running daily incremental forward backups.
Now I would like to setup a Copy-Job for long time retention of certain restore points. I tried it and it currently starts with the latest restore points.
I would like to keep a weekly retention point in the Copy-Job starting from the first backup run 2 weeks ago. How could this be done. Maybe with seeding the Copy-Job Repo with the backups from the Backup-Job ?
Thanks for any help.
Regards,
Thomas
-
- Lurker
- Posts: 1
- Liked: never
- Joined: Dec 11, 2019 7:45 am
- Full Name: Thomas Hommers
- Contact:
-
- Product Manager
- Posts: 20415
- Liked: 2302 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Preserve Backup-Job restore points in Copy-Job
You cannot mark previous restore points as GFS restore points. However, you can export them as independent full backups and assign required retention to them. For restore points, starting from the latest one, you can still use backup copy job. Thanks!
Who is online
Users browsing this forum: Bing [Bot], Semrush [Bot] and 66 guests