Comprehensive data protection for all workloads
Post Reply
WSMC
Lurker
Posts: 2
Liked: never
Joined: May 06, 2010 6:47 pm
Full Name: Ben Raymond
Contact:

Question on proxies in V6..

Post by WSMC »

I have got three total proxies, one on the Veeam server, and one on each on my 2 ESX hosts.

My question is what happens if a backup job kicks off to backup the VM that has a proxy on while it is processing a job?

Gostev
SVP, Product Management
Posts: 28955
Liked: 5303 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Question on proxies in V6..

Post by Gostev »

Nothing bad or good really... the VM will be backed up normally, and neither backup job will "brake".

WSMC
Lurker
Posts: 2
Liked: never
Joined: May 06, 2010 6:47 pm
Full Name: Ben Raymond
Contact:

Re: Question on proxies in V6..

Post by WSMC »

cool, I was a little worried I would have to redo things, overnight is just not enough time to back everything up in serial jobs ;-)

Gostev
SVP, Product Management
Posts: 28955
Liked: 5303 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Question on proxies in V6..

Post by Gostev »

Sure thing, as a matter of fact v6 architecture is all about concurent jobs!

Post Reply

Who is online

Users browsing this forum: david.brunner, eisback, nicbor, nmdange and 65 guests