Hello,
I have a customer who has been placing all of their replication activities into a Single Job. They would like to split it out into multiple jobs to be able to schedule them at different times. Is it possible to somehow split the configuration into multiple jobs without having to do a full resync of the source VM?
I attempted to simply remove the VM from the old job and add it to the new job, and I got the "vmdk already exists" error.
Thanks!
-
- Influencer
- Posts: 13
- Liked: 4 times
- Joined: Jul 13, 2010 12:14 am
- Full Name: Justin Grote
- Contact:
-
- Chief Product Officer
- Posts: 31804
- Liked: 7298 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Reconfigure Replication Jobs without Resyncing?
Hello, no this is not possible with v5. Thanks.