Hello.
We have a VBR for vmware. And we need a function for job scheduling in specific days of month.
For example: backup job per this days of month: 1-st, 15-th, and last three days of same month. And repeat those every months.
I'm was open case in support (Case # 03056514), and TAC engineer let me advice for create new request in this forum.
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Jun 15, 2018 6:45 pm
- Full Name: Roman Ehenov
- Contact:
-
- Chief Product Officer
- Posts: 31804
- Liked: 7298 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Request for feature - sheduling at specifical days of mo
Hello, the easiest way to achieve this is to use Windows Task Scheduler to run this backup job. You can find the command line to start the job on the Summary page of the backup job wizard. Thanks!
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Jun 15, 2018 6:45 pm
- Full Name: Roman Ehenov
- Contact:
Re: Request for feature - sheduling at specifical days of mo
Yes, TAC engineer answer this alike. But this is wrong way. Points of administration spread to many consoles, and this make bad consequences.
-
- Product Manager
- Posts: 20400
- Liked: 2298 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: Request for feature - sheduling at specifical days of mo
For now there is no option in UI to schedule job like that. So, Task Scheduler plus cmdline or PowerShell is the way to go.
Thank you for the feature request, though; appreciated.
Thank you for the feature request, though; appreciated.
Who is online
Users browsing this forum: Bing [Bot], Google [Bot], Semrush [Bot] and 164 guests