Hi,
Over the holiday period I changed all of our backups jobs to "run on these days" and set it up to run on Tuesday to Thursday to cater for public holidays. Normally the jobs are set to "Run on week-days". The backups still ran on the Mondays and Fridays I had set the jobs up not to run. Any ideas on why this would be the case ?

thanks,

John
Gostev
Chief Product Officer
Posts: 31814
Liked: 7302 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: Running backup jobs on certain days

Post by Gostev »

Hi. This can happen if full backups are scheduled to run on these days... or if the job was triggered by something else. Our support can say for sure after reviewing the debug logs. Thanks!
KiwiJJ
Expert
Posts: 105
Liked: 2 times
Joined: Feb 16, 2010 8:05 pm
Full Name: John Jones
Location: New Zealand

Re: Running backup jobs on certain days

Post by KiwiJJ »

Thanks Anton, Full backups are scheduled for every day anyway. I'll open a case to find out what happened.
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Running backup jobs on certain days

Post by veremin »

Thanks Anton, Full backups are scheduled for every day anyway.
That's the reason why the job still runs on Fridays and Mondays. Thanks.
KiwiJJ
Expert
Posts: 105
Liked: 2 times
Joined: Feb 16, 2010 8:05 pm
Full Name: John Jones
Location: New Zealand

Re: Running backup jobs on certain days

Post by KiwiJJ »

Hi Vladimir,
Ok that sorted it, looks like I only changed the days on the schedule page and not the storage page as well.

thanks,

John
veremin
Product Manager
Posts: 20415
Liked: 2302 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Running backup jobs on certain days

Post by veremin »

Full backup schedule predominates over ordinary schedule, indeed. So, if neither incremental nor full backup cycle should take place, be aware to uncheck the corresponding day in the both schedules. Thanks.