at present I'm stuck with scheduling a Backup Copy Job the way it is needed.
Any helpful hint is appreciated.
Environment:
2 VMware hosts (6.0) backed up by a physical machine (W2012R2) , which has sufficient disc space and runs Veeam B&R (8)
Goal:
- Backup Jobs to the above named server's discs are run on every weekdays' nights (works fine)
- On Sundays these Backups shall be synced to rotated external USB 3.0 discs, which are then brought offsite until it's their turn again (???)
Here I'm missing the needed sceduling options in Backup Copy Jobs.
I can set the Job's properties to run every "X" days, to make it run weekly.
The downside: to my understanding with this configuration I have to set the job to "active" on Sunday, when I'm usually not in the office ....

Other approach: set a shorter Backup Copy Job interval (e.g. 12 Hours) and use the Schedule-Function to only allow it's execution on Sunday.
This one's downside: On top of the Schedule-Function Dialogue the first sentence reads: "Specify when this job is allowed to transfer data over the network"
In case this description is correct, all settings made here, will have no impact on my Backup Copy Job as I transfer from disc to disc and don't use the network ?
Any help on how to acheive a weekly backup to disc every Sunday is appreciated
Best Regards CT