Hi Guys
Looking to see if we can use the failover option here with Quick rollback option on an Exchange server
There is scheduled power maintenance happening where the production VMs will be powered down gracefully
The business would like to have exchange running on the DR site during this time . Large VM so failback time is difficult to determine but with the quick rollback is this an advisable option ?
-
- Enthusiast
- Posts: 28
- Liked: 1 time
- Joined: Jan 28, 2015 5:22 pm
- Full Name: Fintan Quinn
- Contact:
-
- VP, Product Management
- Posts: 27371
- Liked: 2799 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: Scheduled Power Down - Failover Scenario
Hi Fintan,
Yes, why not? Just keep these requirements for the rollback to work > Quick Rollback
Thanks!
Yes, why not? Just keep these requirements for the rollback to work > Quick Rollback
Thanks!