Comprehensive data protection for all workloads
Post Reply
tonycraft45
Novice
Posts: 6
Liked: never
Joined: May 20, 2021 9:17 am
Contact:

Setting up a recurring full backup with the "backup copy" job

Post by tonycraft45 »

Hello,

I need to create a "Backup copy" job for my company. The purpose of this job is to copy the backups of our virtual machines to a cloud storage space.

To be more precise, I would like to create a job that would perform an incremental backup every day at 11pm. In addition, I would like to have a full backup every Sunday at 4pm. These full backups will need to be kept for a period of three weeks.

My problem is this: when I configure a "backup copy" job I can't find the option to specify the day and time I want to perform a full backup.

Thanks in advance for your help.

Thank you in advance for your help.
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Setting up a recurring full backup with the "backup copy" job

Post by foggy »

Backup copy job is forever incremental. Since you need to keep weekly full restore points for three weeks, you need to enable and configure the GFS retention.
tonycraft45
Novice
Posts: 6
Liked: never
Joined: May 20, 2021 9:17 am
Contact:

Re: Setting up a recurring full backup with the "backup copy" job

Post by tonycraft45 »

Thank you very much for your answer.

I used the "GFS retention" feature to keep the total backups for three weeks.

However, I don't understand the following: how can I control the frequency and the date and time of launching the full backups mentioned in the GFS retention? Indeed, due to the low bandwidth of my company, I can't afford to launch full backups every day...I can only do it on weekends.

Best regards.

Translated with www.DeepL.com/Translator (free version)
veremin
Product Manager
Posts: 20413
Liked: 2301 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Setting up a recurring full backup with the "backup copy" job

Post by veremin »

how can I control the frequency

The backups will be created once a week, since it's weekly restore point.
the date and time of launching the full backups mentioned in the GFS retention?

You can click "Configure" button and specify a day for weekly GFS restore point.

By the way, what copy mode are you using? Immediate or periodic one?

Thanks!
foggy
Veeam Software
Posts: 21139
Liked: 2141 times
Joined: Jul 11, 2011 10:22 am
Full Name: Alexander Fogelson
Contact:

Re: Setting up a recurring full backup with the "backup copy" job

Post by foggy »

Backup copy doesn't copy the entire VM data from the source but rather synthetically creates full restore points on target according to the GFS schedule you specify. I recommend reviewing this and this user guide sections to get a better understanding of how GFS works within Veeam B&R.
Post Reply

Who is online

Users browsing this forum: Google [Bot], Semrush [Bot] and 88 guests