We are using the periodic schedule, setting varying hours throughout the week to run a job, avoiding peak usage periods. To prevent overlap with other jobs, we would like to set the periodic job to start at :30 after the hour, but have not found a way to do this.
Is it possible to schedule a periodic job that runs once an hour but starts at a set number of minutes after the top of the hour?
-
- Enthusiast
- Posts: 49
- Liked: 1 time
- Joined: Jan 07, 2011 9:30 pm
- Full Name: Tim O'Pry
- Contact:
-
- Chief Product Officer
- Posts: 31783
- Liked: 7284 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Start periodic jobs other than top of hour
Not possible with v5, and should not be needed with v6, since it manages job concurrency automatically for you.