SureBackup and replication job at the same time
Hello to all.
I was wandering if there is a way to do the following
I want to start a SureBackup job, let it running after the boot of all VMs (for testing purposes) but at the same time I want to be able to replicate the VMs that are part of this Surebackup job.
Is there a way to do that?
Thanks in advance
I was wandering if there is a way to do the following
I want to start a SureBackup job, let it running after the boot of all VMs (for testing purposes) but at the same time I want to be able to replicate the VMs that are part of this Surebackup job.
Is there a way to do that?
Thanks in advance
-
- Veteran
- Posts: 1943
- Liked: 247 times
- Joined: Dec 01, 2016 3:49 pm
- Full Name: Dmitry Grinev
- Location: St.Petersburg
- Contact:
Re: SureBackup and replication job at the same time
Hi,
Surebackup is using backup files for recovery verification, you can replicate VMs from the production environment without a trouble, since there will be two copies of VMs running in the infrastructure.
However, if you're using backup files as a source for the replication job, all files will be locked and the replication job will not run. Thanks!
Surebackup is using backup files for recovery verification, you can replicate VMs from the production environment without a trouble, since there will be two copies of VMs running in the infrastructure.
However, if you're using backup files as a source for the replication job, all files will be locked and the replication job will not run. Thanks!
-
- Novice
- Posts: 9
- Liked: 1 time
- Joined: Sep 28, 2016 6:34 am
- Full Name: Odysseas Basdekis
- Contact:
Re: SureBackup and replication job at the same time
Currently I am performing the Surebackup job from the replicas and not from the backup files. So, when the replication job starts, it automatically stops the Surebackup.
Can I avoid that?
Can I avoid that?
-
- Enthusiast
- Posts: 55
- Liked: 7 times
- Joined: Sep 24, 2014 7:44 am
- Full Name: Florian Raack
- Contact:
Re: SureBackup and replication job at the same time
So you mean that you are running SureReplica? As far as I know there is no way to avoid this because a primary backup or replica job has an higher priority than a SureBackup/Replica Job.
May you can avoid this scneraio by scheduling another start time for you jobs.
May you can avoid this scneraio by scheduling another start time for you jobs.
-
- Novice
- Posts: 9
- Liked: 1 time
- Joined: Sep 28, 2016 6:34 am
- Full Name: Odysseas Basdekis
- Contact:
Re: SureBackup and replication job at the same time
I am sure that the job is a SureBackup job. But the VMs that are part of this job is the replicas. As I understand, there is no way to do the replication job on the replicas that are part of the Surebackup job. I was wondering if there is a different version or distribution of Veeam Backup that can do this.
I know that I can avoid this by by scheduling another start time for my jobs, but there is no time window for this. Also maybe I can do this by cloning the replicas and do my sureback job with the clones?
Thanks for the replies and support
I know that I can avoid this by by scheduling another start time for my jobs, but there is no time window for this. Also maybe I can do this by cloning the replicas and do my sureback job with the clones?
Thanks for the replies and support
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: SureBackup and replication job at the same time
You can try to import cloned VMs and run SureReplica via application group (something similar to this procedure) or a dummy replication job mapped to them.sfbpf42 wrote:Also maybe I can do this by cloning the replicas and do my sureback job with the clones?