Currently in a Surebackup job, if you were to schedule a Surebackup job to run, it will run to the previous Restore point of the VM's, but there is no way to schedule a Surebackup job and either state I want the Surebackup job to run to a restore point to let's say 2 weeks prior restore point or to specify a restore point in the scheduled run of that surebackup job.
Is there a way to add this feature in an upcoming release?
Thank you.
Scheduling of Surebackup Job to Specific Date of Restore - Case # 00725010
-
- Influencer
- Posts: 13
- Liked: never
- Joined: Jan 14, 2015 2:24 pm
- Full Name: Gary Belanger
- Contact:
-
- VP, Product Management
- Posts: 27368
- Liked: 2799 times
- Joined: Mar 30, 2009 9:13 am
- Full Name: Vitaliy Safarov
- Contact:
Re: [FEATURE REQUEST] Surebackup Job Scheduling
Hi Gary,
The usual case is to verify the latest restore point of the VM. Can you please elaborate a bit more on why you would like to have an ability to choose 2 weeks prior or so?
Thanks!
The usual case is to verify the latest restore point of the VM. Can you please elaborate a bit more on why you would like to have an ability to choose 2 weeks prior or so?