Post by garybelanger »

Currently in a Surebackup job, if you were to schedule a Surebackup job to run, it will run to the previous Restore point of the VM's, but there is no way to schedule a Surebackup job and either state I want the Surebackup job to run to a restore point to let's say 2 weeks prior restore point or to specify a restore point in the scheduled run of that surebackup job.

Is there a way to add this feature in an upcoming release?

Thank you.

Scheduling of Surebackup Job to Specific Date of Restore - Case # 00725010
Vitaliy S.
VP, Product Management
Posts: 27368
Liked: 2799 times
Joined: Mar 30, 2009 9:13 am
Full Name: Vitaliy Safarov
Contact:

Re: [FEATURE REQUEST] Surebackup Job Scheduling

Post by Vitaliy S. »

Hi Gary,

The usual case is to verify the latest restore point of the VM. Can you please elaborate a bit more on why you would like to have an ability to choose 2 weeks prior or so?