Comprehensive data protection for all workloads
Post Reply
jcorbin121
Influencer
Posts: 11
Liked: never
Joined: Aug 06, 2011 1:39 am
Full Name: John Corbin
Contact:

V6 Scheduling of VMs and Proxies

Post by jcorbin121 »

I read the FAQ on VMWare Proxy issues, not answering my question. The behavior I see is when I have a job that has say 10 VM's and I have specified 3 proxies, the job seems to only schedule one VM at a time and never uses the other 2 proxies. What am i missing, is there a setting? Should I not have 3 VM's backing up simultaneously frolm that job?

Thanks for any help
John
Gostev
Chief Product Officer
Posts: 31775
Liked: 7275 times
Joined: Jan 01, 2006 1:01 am
Location: Baar, Switzerland
Contact:

Re: V6 Scheduling of VMs and Proxies

Post by Gostev »

Hi John, no as within the job VMs are processed sequentially. If you have multiple jobs, they will be assigned to different proxies. Thanks!
jcorbin121
Influencer
Posts: 11
Liked: never
Joined: Aug 06, 2011 1:39 am
Full Name: John Corbin
Contact:

Re: V6 Scheduling of VMs and Proxies

Post by jcorbin121 »

And to further clarify, multiple jobs will be assigned to a single proxy. I setup 6 jobs and assigned all of them to the same 3 proxies and the scheduler assigned two jobs per proxy. So I will have to use smaller # of VM's per job, more jobs, and possibly more proxies.....

thanks!

John
Post Reply

Who is online

Users browsing this forum: Baidu [Spider], Bing [Bot], Google Adsense [Bot], vtsybin and 85 guests