A design question: can Veeam Replication job run concurrently with SRM?
A little more detail about the design: there are two active vSphere site (site A, site B) with SRM storage replication and we want a disaster recovery site with Veeam Backup & Replication. The Veeam will replicate some virtual machines from site A and/or site B to the disaster recovery site, while the SRM will do the storage replication between site A and B. The SRM and the Veeam replication jobs will run at the same time window.
Is this design supported? Are there any known conflict between SRM and Veeam B&R?
Thank you!
-
- Novice
- Posts: 3
- Liked: never
- Joined: Jan 11, 2011 3:39 pm
- Contact:
-
- Chief Product Officer
- Posts: 31749
- Liked: 7253 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Veeam replication running concurrently with SRM
Yes, this design is fine. Thanks!
-
- Novice
- Posts: 3
- Liked: never
- Joined: Jan 11, 2011 3:39 pm
- Contact:
Re: Veeam replication running concurrently with SRM
Thanks Gostev!
Who is online
Users browsing this forum: AdsBot [Google], Egor Yakovlev, Kirassant, mkretzer, murali99, Semrush [Bot] and 129 guests