I have a backup job which was configured at the beginning to run on friday. A week ago I changed the job to run on sundays. But it still runs on fridays, too and under Next run the 9 th November is shown, not the 11th. It seems, the old scheduling entry is not cleaned, when reconfiguring the scheduler. I´m running 6.5.0.109 / ticketid#00153993
Sven
-
- Enthusiast
- Posts: 34
- Liked: 5 times
- Joined: Dec 15, 2011 8:14 pm
- Full Name: Sven Hannisch
- Contact:
-
- Chief Product Officer
- Posts: 31905
- Liked: 7402 times
- Joined: Jan 01, 2006 1:01 am
- Location: Baar, Switzerland
- Contact:
Re: Wrong scheduled backup job
Check if you possibly have full backup still scheduled to run on Friday.
-
- Enthusiast
- Posts: 34
- Liked: 5 times
- Joined: Dec 15, 2011 8:14 pm
- Full Name: Sven Hannisch
- Contact:
Re: Wrong scheduled backup job
This was the problem. The full syntheic job was still scheduled on friday.
Thanks a lot.
Thanks a lot.
Who is online
Users browsing this forum: Bing [Bot], Semrush [Bot] and 39 guests