I was using for example the VM Backup Status report from the templates after I installed VeeamOne 6.5 on 8/19/2013.
Scope: Infrastructure
Reporting Period: 8/19/2013 - 8/25/2013
Group By: Backup Job
then
Save as report
Name: xxxx - VeeamBackupStatus
Folder: VeeamBackup
then(8/19/2013) I am scheduling the report:
Schedule on: everyday at 6:15 a.m.
Recipient: myself@company.edu
I just noticed (I was on vacation

e.g.: I was expecting:
on 8/25/2013 it is sending the report for the period 8/19/2013 - 8/25/2013
on 8/26/2013 it is sending the report for the period 8/20/2013 - 8/26/2013
....
on 9/18/2013 it is sending the report for the period 9/12/2013 - 9/18/2013
etc...
if the period is not changed except manually why having a schedule?
what did I miss?
Thanks,
Dom