Hi, I've a Remote Site connected via slow link (10-MBit)
At the beginning I previously done a backup of a bunch of VMs to a local Veeam Repository, I sent this (*.vbm,*.vbk) to the remote site, copied to remote Veeam Repository, rescanned. After that I successfully ran my first Veeam Backup Job of these VMs over WAN connection using MAP "Backup function".
Now I have to add a new VM (80GB) to this Job, is there a way for seeding only this VM? otherwise the first backup generate too much load over the connection.
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Oct 24, 2014 9:43 am
- Full Name: Andrea Zucchini
- Contact:
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Add VM to Backup Job with slow link destination
Andrea, I would ask first, why do you run regular backup job offsite, instead of having it to run locally and then using backup copy job to sync backups offsite (which is a more effective and recommended approach)? In this case, there would be a way to smoothly re-seed the backup copy job.
-
- Lurker
- Posts: 2
- Liked: never
- Joined: Oct 24, 2014 9:43 am
- Full Name: Andrea Zucchini
- Contact:
Re: Add VM to Backup Job with slow link destination
I created this backup when using an earlier version without Backup copy (Veeam B&R 6.0?) I never changed it since the first configuration,
I'll try the approach you suggest, thank you!
I'll try the approach you suggest, thank you!
Who is online
Users browsing this forum: No registered users and 19 guests