Our version of VBR is 9.5u4a.
We have configured our backup with tag functionnality.
one vmawre tag permits to select a certain number of VM.
The strategy is 7 restore points for the backup job and 60 points in the backup copy .
My problem is the following:
For application reason, i have to keep 100 points of restore for one vm amongs the vms backup with this stratégy.
So ,
I remove the tag for this VM and create a stratégie for that VM . (7 point for the backup and 100 for backup copy)
Is there a way to map the restore points of that VM from the previous strategy ??
I ve seem a way to map for a job but not for a serie of point of restore witch are backup inside a job.
I'm not sure to be very clear

The fact is that with the method used , i have to wait 100 days bebore to respect the need instead of 40 (100 -60) .
Thanks for any help