Hi, I'm currently backing up VM's from Standalone Hosts in VBR. I'm moving these hosts (one at a time) into vCenter. What steps and in what order to take in VBR? (Veeam Support couldn't give me a straight answer)
Thanks
Thanks
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
Hi Samuel, you can leave it as is and continue backing up VMs via standalone ESXi. However, if you decide to switch to backing up via vCenter, you would need to re-add VMs to the jobs, since their ID's will be different, which will result in full data read during the next job run.
-
- Service Provider
- Posts: 5
- Liked: never
- Joined: Sep 04, 2018 2:43 pm
- Full Name: Samuel Eng
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
Thanks for your reply!
Yes, I'm also moving the backups to (going via) the vCenter. I'm pretty sure I need to remove the hosts from Standalone right? Cause of SSL cert et.c.? I guess VBR cannot have two references to the same host? And then do a Rescan (in VBR) of the vCenter?
Yes, I'm also moving the backups to (going via) the vCenter. I'm pretty sure I need to remove the hosts from Standalone right? Cause of SSL cert et.c.? I guess VBR cannot have two references to the same host? And then do a Rescan (in VBR) of the vCenter?
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
There's no need to remove host entries, they won't affect anything.
-
- Service Provider
- Posts: 5
- Liked: never
- Joined: Sep 04, 2018 2:43 pm
- Full Name: Samuel Eng
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
Thanks,
Ok, I see. I tried that in my lab but then I got an error msg in the Backup Job. "Error: Host 'xxx.xxx.xxx.xxx' with type 'ESX' and parentId 'xxx' not found.". I then removed the host as "Standalone" and Rescanned the vCenter (in VBR). Then the job could run. I guess I thought this procedure was described in a KB or something.
Ok, I see. I tried that in my lab but then I got an error msg in the Backup Job. "Error: Host 'xxx.xxx.xxx.xxx' with type 'ESX' and parentId 'xxx' not found.". I then removed the host as "Standalone" and Rescanned the vCenter (in VBR). Then the job could run. I guess I thought this procedure was described in a KB or something.
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
It is just the fact that any infrastructure change requires a rescan. If you had left the host and done a rescan, it would still have fixed the issue.
-
- Service Provider
- Posts: 5
- Liked: never
- Joined: Sep 04, 2018 2:43 pm
- Full Name: Samuel Eng
- Contact:
Re: Moving standalone hosts to vCenter, what steps in VBR?
Ok, I see. So a single host can exist as both a Standalone and also inside a vCenter in VBR at the same time?
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Who is online
Users browsing this forum: No registered users and 22 guests