Hi,
I have upgraded to V8 Full Availability Suite as entitled.
I have turned on WAN Acceleration for Replication backups.
Now my jobs are running serially waiting for the previous VM to finish before attempting the next VM in the JOB. The message says "Resource Not Ready: WAN Accelerator"
1. Is this an issue?
2. Is it only on the first pass since turning on WAN Acceleration.
Thanks
-
- Novice
- Posts: 3
- Liked: never
- Joined: Jul 17, 2013 1:10 pm
- Full Name: Adrian Compton
- Contact:
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Veam B&R V8 Wan Acceleration Replication
Adrian, since source WAN accelerator can process a single task at a time only, parallel processing is not available if you enable WAN acceleration.
-
- Novice
- Posts: 3
- Liked: never
- Joined: Jul 17, 2013 1:10 pm
- Full Name: Adrian Compton
- Contact:
Re: Veam B&R V8 Wan Acceleration Replication
thanks for the reply foggy... so its a trade-off one has to make I presume
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Veam B&R V8 Wan Acceleration Replication
You can set up multiple source accelerators to speed things up, just keep in mind that each pair of accelerators will have a separate cache on the target side.
-
- Veteran
- Posts: 1531
- Liked: 226 times
- Joined: Jul 21, 2010 9:47 am
- Full Name: Chris Dearden
- Contact:
Re: Veam B&R V8 Wan Acceleration Replication
If you are needing wan acceleration , it woudl be safe to assume that a single thread can saturate the available bandwidth between sites ? in which case why would you want to attempt to replicate more than 1 VM at a time?
Who is online
Users browsing this forum: Majestic-12 [Bot], Semrush [Bot] and 40 guests