Post by IMEXDAN »

Hi
We have migrated to Veeam from BE2012 and are struggling to mirror the setup with regards to tape overwrites. Currently we backup all hyper-v guest machines as individual jobs overnight (approx. 10 machines). These multiple backup to disks work perfectly well and is set to use reverse incremental with a weekend full active backup. The aim is to always have a complete virtual machine image that can then be duplicated to tape.
We then through the day duplicate all of the guest VM disk jobs to tape as individual jobs. This again works perfectly well and stores a copy of the full VM on the tape.
The problem we have is that in BE2012 we could set the first tape job to 'overwrite the tape' and the last job to eject the tape. In Veeam we are struggling with understanding the logic around setting a tape to be overwritten. We have setup one media pool with a retention of 1 day, and have at least 7 days of tapes all in the pool. However when the daily tape comes round for overwriting the jobs appear to append only.
Is there any way to automate the adding of a new tape to the media pool, and also setting the inserted tape as fully overwriteable ready for the duplicate jobs?
The guides refer to simply setting the retention in the media pool, but this doesn't seem to have the desired effect and we find jobs appending.
We have installed the latest patch that referred to a similar problem with tape append only.
Any help much appreciated.
Dan
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

What settings are specified in "Media Set" tab (Media Pool -> Mediaset)? Thanks.
IMEXDAN
Novice
Posts: 4
Liked: never
Joined: May 12, 2014 11:36 am
Contact:

Re: Daily tape overwrite

Post by IMEXDAN »

Hi
Media set "Daily Tape Media Pool";
"Do not create, always continue using current media set"
"Protect data for 1 day"

Dan
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

"Do not create, always continue using current media set"
I believe this is the reason why the data is appended to tape medium. Try to set "Create media set for every backup session" or "Daily at" option and see whether it helps or not. Thanks.
fcmajor
Novice
Posts: 9
Liked: never
Joined: Mar 17, 2014 11:13 am
Full Name: Jens Zimmermann
Contact:

[MERGED] : retention period

Post by fcmajor »

Hello

I have some problems with the retention period of the full backup tapes.
It does not overwrite the media.
My disk job settings are: Restore points on disk 3
Media Pool settings: Protect data for 2 weeks.

But e.g. a fullbackup from 23.03.2014 is on the tape and now I wanted to use this tape last friday (16.05.2014) it continues to write on the tape until it is full, but it should overwrite the old backup and put the new one on the tape.
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: retention period

Post by veremin »

What are the media set settings (Media Pool -> Media set)? Thanks.
fcmajor
Novice
Posts: 9
Liked: never
Joined: Mar 17, 2014 11:13 am
Full Name: Jens Zimmermann
Contact:

Re: retention period

Post by fcmajor »

it the weekly pool: "Do not create, always continue using current media set"
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

Retention settings applies to media sets. In your case, there is only one mediaset. Thus, the data is appended to tape medium, until it is full.

If you want to overwrite tapes, then, you should select different media set creation settings: be it "create new media set for every" or "daily at" - whichever one you like.

Thanks.
IMEXDAN
Novice
Posts: 4
Liked: never
Joined: May 12, 2014 11:36 am
Contact:

Re: Daily tape overwrite

Post by IMEXDAN »

Hi
If we use "Create media set for every backup session" will this cause a problem when running multiple duplicate jobs on to the same tape during the same day?
i.e. a new media set created at the start of every job (potentially 10 or more a day).
Dan
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

If we use "Create media set for every backup session" will this cause a problem when running multiple duplicate jobs on to the same tape during the same day?
Each job will use a separate tape, as one medium can't host two different media sets. In this case, daily mediaset creation might be your way to go. Thanks.
IMEXDAN
Novice
Posts: 4
Liked: never
Joined: May 12, 2014 11:36 am
Contact:

Re: Daily tape overwrite

Post by IMEXDAN »

Hi
I will set the media pool to create a new media set daily.
How to enable tape to be automatically added to the new media set?
Will I have to script something to set the tape as free prior to the first job running?
Thx
Dan
Dima P.
Product Manager
Posts: 14396
Liked: 1568 times
Joined: Feb 04, 2013 2:07 pm
Full Name: Dmitry Popov
Location: Prague
Contact:

Re: Daily tape overwrite

Post by Dima P. »

Dan,

Once you set "Create new media set daily" option on the media pool, free or retired media would be taken from this pool automatically. So does tape auto cleaning – when tape media is retired and was taken by backup to tape job it would be overwritten (short erase) before job actually put new data on it.
idc2014
Influencer
Posts: 16
Liked: never
Joined: Jun 15, 2014 6:30 am
Full Name: hamadatosson
Contact:

[MERGED] : media set and tape retention policy

Post by idc2014 »

i make full backup job every 2 days per week , then backup this job to tape with " protect data for 5 days " and media set is " don't create , always continue using current media set " the tape is full without overwrite the old backups in the tape
idc2014
Influencer
Posts: 16
Liked: never
Joined: Jun 15, 2014 6:30 am
Full Name: hamadatosson
Contact:

[MERGED] : data protected

Post by idc2014 »

i set tape job with full backup run one day every week , and set media pool with one tape
* " don't create always continue with current media set "
* "data retention is " protect data for 5 days "

i asked why the tape did not delete old backups ?
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: media set and tape retention policy

Post by veremin »

Unfortunately, part of the message appears to be missing. Thus, it's not clear what the question is. Thanks.
idc2014
Influencer
Posts: 16
Liked: never
Joined: Jun 15, 2014 6:30 am
Full Name: hamadatosson
Contact:

Re: media set and tape retention policy

Post by idc2014 »

the main question is when i set protect data for 5 days and media set is don't create , always continue using current media set , the tape did not apply the policy , i mean it does not erase old data ????
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

As mentioned above, the main reason is mediaset options you're currently using. As there is only one mediaset (forever), the retention settings can't be applied. Try to set different settings (be it "create new media set for every" or "daily at") and see whether it makes any difference. Thanks.
idc2014
Influencer
Posts: 16
Liked: never
Joined: Jun 15, 2014 6:30 am
Full Name: hamadatosson
Contact:

Re: Daily tape overwrite

Post by idc2014 »

i set tape job with full backup run one day every week , and set media pool with one tape
* " don't create always continue with current media set "
* "data retention is " protect data for 5 days "

i asked why the tape did not delete old backups ?
veremin
Product Manager
Posts: 20270
Liked: 2252 times
Joined: Oct 26, 2012 3:28 pm
Full Name: Vladimir Eremin
Contact:

Re: Daily tape overwrite

Post by veremin »

Have you reviewed the answers above? More specifically, this one.
* " don't create always continue with current media set "
With this option in place, the retention settings can't be applied, since there is only one mediaset. If you want to overwrite data, you should try different mediaset creation options (daily, etc.).

Thanks.