I am currently moving from an all virtual Veeam setup to a physical VBR server so I can shift from Backup Exec to Veeam tape support.
I am also moving from a reverse Inc for forward inc to make the tape backup window shorter on week days.
Backup Config
Saturday 00:00AM synthetic full with Transform
Tues 00:00am Inc
Wed 00:00am Inc
Thur 00:00am Inc
Fri 00:00am Inc
Restore point to keep on disk 25
Backup Copy Job to Remote site using GFS.
7 days
4 Weeks
12 Months
I also replicate teir 1 VMs to remote site
Now for the Tape Part
All I want to archeive with the tape solution is below, Tape is only for the extreme purpose that we lose both sites( there is not a huge geographical distance between them approx. 3 miles) Call me paranoid but we have the kit so may as well use it

I only have a single LTO6 tape drive
10 tapes
Backup to tape on the same days that the above backups run see below
Sat Copy new VBK and any new vrbs created by transform
Tues Copy new vib
Wed Copy new vib
Thur Copy new vib
Fri Copy new vib
Sat Copy new VBK and any new vrbs created by transform
Tues Copy new vib
Wed Copy new vib
Thur Copy new vib
Fri Copy new vib
What I also want to be able to do is on the first Saturday of the month is remove the Saturday tape for archive purposes and put a brand new tape in its place.
I only have a single LTO6 tape drive so scheduling an addition monthly job to run over a weekend proves difficult as no one is around to change tapes
Does the above sound feasible?
Thanks
Kev